Omega DC

Project:         Omega DC Warehouse
 
Description:
The Automated Distribution Center is a pivotal element in the Landmark Group’s supply chain network. Situated in Jebel Ali Free Zone South, it boasts a sprawling plot area of 265,188 sq. m. and a substantial built-up area of 157,791 sq. m. The Main Warehouse stands at a height of 26.62 meters, while the High Bay Warehouse reaches an impressive 40 meters. This facility plays a key role in optimizing logistics and enhancing efficiency within the distribution network.
 
Dynamic has successfully carried out MEP Design and Supervision services for the following key areas:

1. Heating Ventilation and Air Conditioning System
2. Smoke Management System
3. Water Supply and Drainage System
4. Electrical Systems (Lighting & Power  Distribution)
5. Fire Protection Service (Firefighting & Fire Alarm)
6. LPG System for steam boilers and steam tunnel
7. Low current system (BMS, Telephone/ Data, CCTV etc.,)
 
Furthermore, Dynamic executed all infrastructure design works.

1. Water cooled centralized plant (16,000 Kw)
2. External chilled water distribution network
3. Fire
4. Complete water recycling system
5. 4 nos. substations, 13 nos. transfer & 11 Kv
direct HV connected to chillers total capacity 16 MW.
4. External fire pump room. Piping and Hydrant etc.,
5. External façade lighting and structural cabling
 
Client: Landmark Group

Main Consultant: Planquadrat Middle East

Construction Cost: AED 1,500,000,000