Al Quoz Jumeirah Hospitality

Project:    Al Qouz Jumeirah Hospitality Project
Al Qouz, Dubai, U.A.E

Decription: The project has 44 buildings in which Dynamic handles the MEP Design and Supervision work with the following major services offered:  

1. Heat Ventilation and Air Conditioning System
2. Water Supply and Drainage System
3. Electrical System (Lighting, Power Distribution, Low Current, Fire Alarm,
Telephone / Data)
4. LPG System
5. District Cooling network
6. Building Management System

Also Dynamic carried-out all infrastructure Design works:

1. External Water Supply
2. Fire Hydrant External & Irrigation System
3. ETISALATHV / LV Power Cables
4. Street Lighting System

Client: Dubai Properties

Main Consultant: Rice Perry Ellis

Construction Cost: AED 1,900,000,000
Scroll to Top