Project: Al Qouz Jumeirah Hospitality Project Al Qouz, Dubai, U.A.E Decription: The project has 44 buildings in which Dynamic handles the MEP Design and Supervision work with the following major services offered: 1. Heat Ventilation and Air Conditioning System 2. Water Supply and Drainage System 3. Electrical System (Lighting, Power Distribution, Low Current, Fire Alarm, Telephone / Data) 4. LPG System 5. District Cooling network 6. Building Management System Also Dynamic carried-out all infrastructure Design works: 1. External Water Supply 2. Fire Hydrant External & Irrigation System 3. ETISALATHV / LV Power Cables 4. Street Lighting System Client: Dubai Properties Main Consultant: Rice Perry Ellis Construction Cost: AED 1,900,000,000 |