Project: Al Aweer Warehouse Description: The warehouse for Mr. Abdullah Abbar & Sons serves as a dedicated storage facility for fruits and vegetables, featuring a 10,000 m² area, including half allocated for cold storage capabilities. Dynamic has accomplished the Design and Supervision for MEP work, rendered here are major services: 1. Heating Ventilation and Air Conditioning System 2. Smoke Management System 3. Water Supply and Drainage System 4. Electrical System (Light And Power Distribution) 5. Fire Protection ServiceSmoke Management System 6. Low Current System (Telephone/Data, CCTV & Structural Cabling) Furthermore, Dynamic Executed all Infrastructure Design works: A. Ammonia Centralized Plant B. Drain and Storm Water C. Telephone/Structural Cabling as per Etisalat D. Fire Hydrant and Pump Client: Abdullah Abbar & Sons Cold Stores Main Consultant: Planquadrat Middle East Construction Cost: AED 50,000,000 |