Project: Larish Mall (B+G+4FLR+ROOF) Kish Island Description: The shopping mall comprise part basement, ground floor plus four upper floor and roof with the total budget of more than Dhs.27,000,000 million on the Kish Island. Dynamic has undertaken the Design and Supervision services for MEP, encompassing the following key areas: 1. Heating Ventilation and Air Conditioning System 2. Water Supply and Drainage System 3. Electrical System (Lighting & Power Distribution, Low Current, Fire Alarm, Telephone / Data) 4. Firefighting & Alarm System 5. Building Management System 6. LPG System Also Dynamic carried-out all infrastructure Design Works: 1. External Water Supply 2. Fire Hydrant External & Irrigation System 3. HV / LV Power Cables 4. External Lighting And Controls Client: Larish Mall Group Main Consultant: Safeer Engineering Consultant Construction Cost: AED 27,000,000 |